[关键词]
[摘要]
为提高水电工程项目管理效益,本文提出应用熵权可拓物元评价法对水电工程施工质量进行评价。在分析水电工程施工质量评价相关特点的基础上,构建了评价指标体系,进而依据最大隶属度原则建立了水电工程施工质量熵权可拓物元评价模型。通过实例评价证实,所建模型的评价结果与工程实际相符。
[Key word]
[Abstract]
To improve the efficiency of the hydropower project management, this paper proposed entropy-weight and matter-element evaluation model to evaluate the quality of hydropower project construction. On the basis of analyzing the characteristic of the hydropower project construction quality , this paper established evaluation index system. Then, based on the maximum membership degree principle established entropy - weight and matter-element model for hydropower project construction quality. By an example evaluation, confirmed that the evaluation result of the model is consistent with the engineering practice.
[中图分类号]
[基金项目]
国家自然科学基金项目(51379110)