Discussion on Flood Resources Utilization in Huaihe River Basin of Shandong Province Based on Network Construction
Article
Figures
Metrics
Preview PDF
Reference
Related
Cited by
Materials
Abstract:
From the perspectives of engineering conditions, water resources, level of science and technology, and ideas of water control, the feasibility of flood resources utilization in the Huaihe River Basin of Shandong Province was discussed. In consideration of the balance of supply and demand in the present and planning years, economic operation of South-to-North Water Diversion Project, and improvement of water resources guarantee ability, the necessity of implementing flood resources utilization in the Huaihe River Basin of Shandong Province was demonstrated. Based on the construction planning of water network in Shandong and layout of water conservancy projects, a set of feasible ways to implement transbasin flood resources utilization measures were proposed for the Yishu River water network, Nansi Lake water network, and Yishu-Si water network. The measures included (1) strengthening the research on the flood resources utilization in the large-scale reservoir in the Yishu River water network, such as stage operation of flood control level and dynamic control; (2) implementation of stage operation of flood control level and dynamic control, optimization of plain river network in the west of Nansi Lake, and utilization of flood resources in the large-scale reservoir in the east of Nansi Lake; and (3) strengthening the utilization of flood resources in the Yishu-Si water network and transferring flood to Shandong Peninsula using the water transfer line in the Eastern Route of South-to-North Water Diversion Project.