Selection of project management mode of water transfer project based on combined entropy weight
Article
Figures
Metrics
Preview PDF
Reference
Related
Cited by
Materials
Abstract:
In the construction of water diversion project, selection of management mode for project construction directly affects the management targets, such as quality, cost, and schedule of construction. In this paper, an evaluation index system of manage 2 ment mode selection in the water diversion project is constructed, a model is established using the fuzzy analytic hierarchy process ( FAHP), and the evaluation method and process of management mode selection in the water diversion project are illus2 trated. The minimum relative information entropy principle is introduced to the model, and the combined weights of indexes are determined based on the combination of the subjective weights and objective weights. T he index system is applied to evaluate a project in the Eastern Route of South2to2North Water Diversion, and the most suitable project management mode for this project is obtained. The results show that the management mode is reliable, and the system and model can provide new method and thoughts for the management mode selection in the water diversion project.