The study on water-supply scheduling ways of Danjiangkou hydro project
Article
Figures
Metrics
Preview PDF
Reference
Related
Cited by
Materials
Abstract:
The method of water-supply scheduling is an important issue concerning producing more benefits from the Danjiangkou hydro project. In this paper, a graph of water-supply scheduling was proposed for efficient utilization of water resources, based on the planning & design achievements of the Phase-I South-to-North Water Transfer Middle-Route Project and the requirements on water scheduling scheme compilation for the Middle Route Project. Meanwhile, designed hydrological inflows were used to check the proposed scheduling graph. Results showed that the graph is clear and easy to operate. The operation of Danjiangkou hydro project based on this graph can satisfy the designed water demand of all users and make the water transfer process more balanced. The scheduling graph can guide the operation of Danjiangkou hydro project.