Analysis and practices of water regulation in the Middle Route of South-to-North Water Transfer Project
Article
Figures
Metrics
Preview PDF
Reference
Related
Cited by
Materials
Abstract:
The Middle Route of the South-to-North Water Transfer Project has been running safely and the water quality along the line was up to standard in the past two years. The total outflow from Taocha canal headwork is more than 6 billion m3. In order to optimize the real-time water regulation of the Middle Route Project, it is necessary to systematically summarize the water regulation scheme, water regulation plan, and the water regulation practices in the past two years. This paper introduces the water regulation scheme of the project, the annual transferable water volume of Danjiangkou Reservoir, the annual water regulation plan, as well as the water regulation practices of the project in the past two years. It analyzes the water regulation benefits, actual water transfer volume, and water transfer loss of the Middle Route Project. It also reviews the practices of and existing problems in water regulation of the Middle Route Project and proposes corresponding suggestions.